The scope of works included mounting of the installation, connecting it and preparation for commissioning:
- power distribution, switchgears, aggregates, generators,
- emergency installation, lighting, batteries,
- internal and external lighting,
- IAS automation system,
- navigation system,
- fire-fighting, PA, GA,
- traffic and sound signalling,
- intercom Internet and telecommunications network,
- ramp hydraulic system, anchor windlass,
- water fog system.